KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  6-8-2016
Number of Hours:  6.00
Manual Reference:  
Brief Description:  Construction of Canopy Frame

Early in the morning I laminated an other lamella for the front bow. This should be early enough, so I can laminate an other one in the evening.

Cut from 2mm SS (V2A) pieces for the bow to frame connectors. Went over to a friend to bend the sheet metal on a bending machine. Front bow with a 60° angle, while the rear bow will be installed in a 70° angle from the horizontal.

In the evening I welded (TIG/WIG) the pieces togehter. The welding rod was specially chosen for the material. Before I got started with the real pieces I did some trials to set up the welding machine and to get used to the material.


Last but not least, an other lamella was bonded in place.

Good night!
' style=





' style=




' style=

Testpieces!!

Testpieces!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.